Contact: 0330 077 66 55

Case Studies

  • plant room
    We created and assembled a 36 meter long sectional plant room with a host of features.
    Read more
  • We were contacted by Clare Plumbing in London after a customer had supplied him a header and manifolds which had been condemned by his client.



    Read more
  • data centre
    We were commissioned to produce an extensive datacentre cooling pipework prefabrication and installation (approx. 400m of DN300 tube with insurance audited welding) for a premium client.
    Read more
  • chp room
    Completed in September 2013, we constructed a combined heat and power, complete with boilers and a hot water storage plant room finished with steel cladding.
    Read more
  • Chiller Installations
    We have carried out dozens of chiller installations and chiller upgrades for a variety of clients.
    Read more
  • boiler unit
    We currently supply packaged boiler kits for one of the main brands of boilers sold in the UK.  We also provide biomass boilers.
    Read more
  • boiler house
    Case study: Jun 2012

    Our client in York required a boiler house to be completely fitted out with only a 1 week window. Using the measurements of the room, we built the equipment in jigsaw modules in our works and delivered to site in easily-handled sections. The reassembly took 1 day and the final connections 1 day.
    Read more